Utility Infrastructure Improvements

Utility Provider; Illinois

OBJECTIVES

Roux evaluated over 15,000 linear feet of aging storm sewer conveyance system throughout the 50-acre active facility to assess inflow and infiltration of shallow PCB-impacted groundwater. Over 800 linear feet of PVC storm sewer pipe and 1,700 linear feet of Cast-In-Place Piping (CIPP) was installed. In addition, Roux designed and constructed two oil/water separator (OWS) systems to increase stormwater treatment capacity in order to meet a stringent PCB discharge limits. A 25,000-gallon OWS unit and a 50,000 gallon OWS unit were installed with a combined flow rate of 7,500 gallons per minute.

Learn more about our Engineering & Remediation Services and Public Sector.

PROJECT DETAILS
Location

Illinois

Client

Utility Provider

Roux Services

Storm Sewer Conveyance System Evaluation

Pipe Installation

Oil/Water Separator Design and Construction

Let's Connect

Stay up to date and get notified with important Roux updates.


    This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.