Electric Mutual Liability; Multiple Locations
Roux was retained as an expert witness regarding the timing of PCB deposition in the Hudson and Housatonic Rivers. Much of the timing analysis for the two rivers was based on Cesium-137 data collected by the United States Environmental Protection Agency (USEPA), historic aerial photos, sediment cores, and recent dredging data. The case settled after submission of Roux’s expert reports.
Click here to learn more about our Insurance Support Services.
Multiple
Electric Mutual Liability
Expert Witness
Timing Analysis